summaryrefslogtreecommitdiffstats
path: root/playbooks/byo/openshift-cluster/upgrades/v3_3/upgrade_nodes.yml
Commit message (Collapse)AuthorAgeFilesLines
* v3.3 Upgrade RefactorRussell Teague2017-05-021-100/+1
|
* Refactor initialize groups tasksRussell Teague2017-04-121-0/+2
| | | | | | | | | | | | Two tasks for initializing group names for the byo playbooks was located in the common folder in the std_include.yml file. Byo dependencies should not be in the common folder. The two tasks have been removed from common/openshift-cluster/std_include.yml to a new file byo/openshift-cluster/initialize_groups.yml. All references where these tasks were included from either std_include.yml or other various files have been updated to use the byo initialize_groups.yml. The methodology implemented follows the pattern of having groups set up in byo then calling out to playbooks in common, which are common to all deployments.
* - update excluders to latest, in non-upgrade scenarios do not updateJan Chaloupka2017-03-071-1/+1
| | | | | | - check both available excluder versions are at most of upgrade target version - get excluder status through status command - make excluders enablement configurable
* Move excluder disablement into control plane and node upgrade playbooksScott Dodson2017-02-061-0/+4
| | | | | So that excluder is disabled and reset within the scope of each of those in addition to the overall playbook
* Adding names to plays and standardizingRussell Teague2017-01-271-2/+2
|
* Use pre_upgrade tag instread of a dry run variable.Devan Goodwin2016-09-291-7/+26
|
* Skip the docker role in early upgrade stages.Devan Goodwin2016-09-291-4/+6
| | | | | | | | This improves the situation further and prevents configuration changes from accidentally triggering docker restarts, before we've evacuated nodes. Now in two places, we skip the role entirely, instead of previous implementation which only skipped upgrading the installed version. (which did not catch config issues)
* Allow filtering nodes to upgrade by label.Devan Goodwin2016-09-291-5/+5
|
* Split upgrade for control plane/nodes.Devan Goodwin2016-09-291-8/+27
|
* Verify masters are upgraded before proceeding with node only upgrade.Devan Goodwin2016-09-281-1/+7
|
* Attempt to tease apart pre upgrade for masters/nodes.Devan Goodwin2016-09-281-0/+47
|
* Split upgrade entry points into control plane/node.Devan Goodwin2016-09-281-0/+9